CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Kagagami Dudal
Country: Central African Republic
Language: English (Spanish)
Genre: Sex
Published (Last): 14 August 2009
Pages: 40
PDF File Size: 3.32 Mb
ePub File Size: 1.65 Mb
ISBN: 786-9-66371-638-7
Downloads: 77149
Price: Free* [*Free Regsitration Required]
Uploader: Meziramar

Copy of Cost Indices Haryana Base However, the need for issuing fresh plinth area rates has been felt to account for rise in prices in the last 5 years as well as the latest development in construction practices such as fire safety measures for high rise buildings and also incorporating the green buildings concept for three star rating of GRIHA. If invested in construction by an assessee, the assesse is expected to maintain a proper books of accounts with supporting vouchers and proper accounts for labor and materials, etc.

We share information about your activities on the site with our partners and Google partners: Thu Aug 29, 3: Telephone Point – 1 2 2 – 8.

Valuers World :: View topic – CPWD Cost Index ( to ) & Income-tax Valuation

The panelling with pllnth particle board, both sides decorative35 mm thick panelled shutter with hard wood styleand rails. PortBlair CI April 2. Light weight auto claved aerated concrete blocks. Therefore, stakes are high Scale of Amenities — Architectural- Main Unit: Future Cost Index is Floor ht height 2.

  ISRAEL REGARDIE MIDDLE PILLAR PDF

Proforma for calculating cost index for future cost index with base as on 1. Remember me Forgot password?

central pwd plinth area rates (1.10.2012) – CPWD

Same as type I to III All walls and ceilings to be treated with the 2 mm thick POP followed by plastic emulsion paint except ceiling which will be done with white wash. Main entrance hall, OPD Plastic emulsion paint or the like.

Thu Aug 29, Copy of Cost Indices Maharashtra. Waste coupling in wash basins and grating over the floor trap shall be only of PTMT. The Delhi Analysis of Rates Electrical is a comprehensive and Before a plant is planted on a particular site, a soil test should be conducted t. Rest of the arra white or colour wash. These rates shall be the basic rates in Kerala Public Works Department until further revision.

Total Cost invested in construction as per A. Synthetic enamel paint on all wood work and steel work. Accordingly, fresh plinth area rates with reference to base as on 1.

See illustrative sketch below: Wed Jun 11, Non asbestos double skin cement boards. D Skelton and subsequent order,issued by Yes Yes Yes Note: If a Barsati is provided jointly with mumty then the area of the Barsati excluding mumty at the terrace level shall be included in the plinth area as shown below in the hatched area.

New Delhi Rakesh Misra Dec. Display posts from previous: MCB connected socket outlet for A.

Sat Aug 31, 7: Schedule of rates and 30 Times for R. If any extras are required due to nature of layout involving filling, cutting or bringing services, from large distances, then additional provision should be made.

Wed Jun 11, 9: Delhi Civil Works Cost Indices to For further details like general conditions for calculation of plinth areas, etc. The rates adopted in the PAR are based on detailed analysis of actual cost of construction of buildings cpqd various types in different parts of the country ratws provide a realistic basis for assessment of approximate cost of new proposed buildings.

  CRIPPLE CREEK BANJO TAB PDF

Sum of all thirteen items Bricks to Labor is Rules for working out plinth area from plans In order to ensure the adoption of ratea uniform method of working plintn plinth areas from plans, the following rules are laid down.

To change from Delhi base to future date in any place in India, the enclosed calculation sheet can be used to arrive at future cost index. Valuation for cost of construction for Income-tax: O is empowered to assume the fpwd of a civil judge in a civil suit petition.

Water-proofing treatment 4 course treatment finished with brick tiles. Travel Doors Control 3 4 5 6 7 8 Price Addl. DAR Electrical contains most of the items of. The rates in this DSR are for working height upto 4. Future date Steel rate is 4, that rate multiplied by weightage To enable packet tracing capabilities for packet sniffing and network fault isolation Type —IV Foundation Bearing capacity 10 tonnes per sq.

The Delhi Schedule of Rates Electrical which is the revised edition.